4
EN-28
Installation and Operating Instructions - EOS Zeus HD / Zeus L HD
Electrical installation
EN
Electrical installation
4.1 General instructions for electrical installation
Ensure that electrical installation is performed in compliance with the
standards and legal norms valid in your country.
If a residual current device (RCD) is installed, ensure that no other electrical
consumers are fused via this RCD.
If the sauna heater has not been used for an extended period of time, the
heater may draw moisture from the ambient air, which, in rare cases, could
lead to the RCD to be tripped. This is a physical process and not a fault on
the part of the manufacturer.
In this case, the heater must be heated by a technician under supervision
which will bypass the RCD function. Once the moisture has escaped from
the heating elements after approx. 10 minutes, the RCD can be integrated
again in the electric circuit.
If the sauna heater will not be used for an extended period of time, we rec-
ommend that you switch on the heater every 6 weeks so that the heating
elements do not accumulate moisture. If, during commissioning, the RCD is
triggered, the electrical installation must be checked again.
The electrician is responsible for properly connecting the heaters; thus, the
manufacturer does not assume liability.
4.2 Connections
The sauna control unit, the power extension unit, and the EOS Zeus HD
heater must be connected as shown in the circuit diagrams. The internal
wiring differs depending on the heater output.
Please observe the installation and operating instructions for the control
units and power extension units.