6
• To watch an assembly
video, go to
http://productvideo.co/
assembly/dsg/epic or
use your mobile phone
or smartphone to read
the QR code with an
application such as
ShopSavvy.
• Assembly requires two persons.
• Place all parts in a cleared area and remove the
packing materials. Do not dispose of the packing
materials until you
nish all assembly steps.
• Left parts are marked “L” or “Left” and right parts
are marked “R” or “Right.”
• To identify small parts, see page 5.
In addition to the included tool(s), assembly
requires the following tools:
one Phillips screwdriver
one rubber mallet
Assembly may be easier if you have a set of
wrenches. To avoid damaging parts, do not use
power tools.
ASSEMBLY
1. Set a sturdy piece of packing material under the
front of the Frame (1).
Have a second person
hold the Frame to prevent it from tipping
while you complete this step.
Orient the Front Stabilizer (2) so that the wheels
(not shown) are facing away from the exercise
bike. Attach the Front Stabilizer to the Frame (1)
with two M10 x 105mm Screws (76).
Remove the packing material.
76
Wheel
2
1
1
2. Orient the Rear Stabilizer (3) as indicated by the
sticker.
Set the rear of the Frame (1) on the Rear
Stabilizer (3). Attach the Rear Stabilizer with two
M10 x 45mm Screws (80).
2
3
80
1
Summary of Contents for A17r Bike
Page 30: ...30 NOTES...
Page 31: ...31 NOTES...