Stand 26.11.08, SB 55 SV, Drills
Page 22 of 37
3.5.2
Sight check/ manual function check
Attention!
Machine may not be connected with grid.
Replace during sight check all transport locks.
Check whether the machine has visible defects, f. e. damaged
cables, disconnected pipes or leakages
Check all mechanical components about smoothness
Check all control elements about mechanical function and
smoothness
3.5.3
Electrical connection
The mains plug (CEE-400/16A, CEE-230V/16A) is correct pre
–
assembled at the front side. The machine turning filed is adjusted at
clockwise rotation.
Check whether the circuit (coverage of the feed line) is accordant to
the information of the machine connection data
3.5.4
Function check
Accomplish a safety check at the machine (view point 1.7 safety
check of the machine)
Check the running direction of the centre sleeve. Front
– sided the
machine was adjusted at clockwise direction turning field.
Summary of Contents for SB 55 SV
Page 30: ...Stand 26 11 08 SB 55 SV Drills Page 30 of 37 7 Exploded drawing 7 1 Exploded drawing actuator ...
Page 32: ...Stand 26 11 08 SB 55 SV Drills Page 32 of 37 9 Exploded drawing 9 1 Exploded drawing stand ...
Page 34: ...Stand 26 11 08 SB 55 SV Drills Page 34 of 37 11 Circuit diagram 11 1 Circuit diagram SB 55 SV ...