8
Erecting the Tent
Install four of the six
9’ Legs
on an adjacent side. Lift one side of frame and slide assembled
9’ Leg
into the
Corner
. Align holes and secure with
Lock Pin
.
12
Insert
S-Hook
at the bottom of the
Toggle Rope
into the hole in the
Base
. Tension rope by pulling
toggle down. Tie off slack rope tails. NOTE:
Toggle Rope
should slide outward from the ring as toggle is
pulled down.
13
3
Corner
5
10
Lock Pin
10
9’ Leg
3
Lock Pin
10
Corner
5
5
9’ Leg
3
Canopy
4
1
Canopy
1
Toggle
9’ Leg
3
Base
4
S-Hook
Toggle
S-Hook
Slide down
to tension
Toggle Rope
should slide
outward from
the ring.