Page 28
EPS Stromversorgung GmbH
Alter Postweg 101 • 86159 Augsburg
Germany
ELR 9000 Series
Fon: +49 821 / 570451-0
Fax: +49 821 / 570451-25
2.3.2 Preparation
Mains connection of an energy back-feeding electronic load of ELR 9000 series is done via the included 5 pole
plug on the back of the device. Wiring of the plug is at least 3 strand or, for some models, 5 strand of suitable cross
section and length. For recommendations for cable cross section see
“„2.3.4. Mains connection (AC)“.
Dimensioning of the DC wiring to the voltage source should also reflect the following:
•
The cable cross section should always be specified for at least the maximum current of the
device.
•
Continuous operation at the approved limit generates heat which must be removed, as well as
voltage loss which depends on cable length and heating. To compensate for these the cable
cross section should be increased and the cable length reduced.
2.3.3 Installing the device
•
Select the location for the device so that the connection to the source is as short as possible.
•
Leave sufficient space behind the equipment, minimum 30 cm, for ventilation of warm air that
will be exhausted even with devices which feed back up to 90% of the consumed energy.
A device in a 19” housing will usually be mounted on suitable rails and installed in 19” racks or cabinets. The depth
of the device and its weight must be taken into account. The handles on the front are for sliding in and out of the
cabinet. Slots on the front plate are provided for fixing the device (fixing screws not included).
On some models the mounting brackets provided to fix the device in a 19” cabinet can be removed so that the
device can be operated on any flat surface as a desk top device.
Acceptable and unacceptable installation positions:
Standing surface