Installation Instructions
AN2 Series
13
3.
Align holes in control pad with bosses in control housing
and push control pad into place. (See Figure 18)
4.
Secure control pad into place using two #4-24 x 1/4" Phillips
pan head screws (DD). Do NOT over tighten. (See Figure 18)
5.
Close lower cover of control pad. (See Figure 18)
6.
Attach all cables, including IR cable (NN), to control pad
following instructions included with projector/control pad.
7.
Use cable ties (R), as necessary, to secure the cables within
control panel. (See Figure 18)
Figure 18
8.
OPTIONAL:
The tab in the control panel assembly door
may be removed to allow attachment to the USB port. (See
Figure 18)
Installing Control Housing
1.
Open door on control panel assembly (EE).
2.
Insert edges of control panel assembly (EE) into groove in
whiteboard frame, with tab placed behind whiteboard. (See
Figure 19)
3.
Slide control panel assembly up along side of whiteboard to
the desired height. (See Figure 19)
4.
Determine attachment location on wall. (See Figure 19)
5.
Mark attachment hole through slot in control panel
assembly (EE). (See Figure 19)
6.
Slide control panel assembly up or down, away from
marked hole.
7.
Drill one pilot hole (see Table 1 for size) at location marked
in Step 5 (See Figure 19) and follow fastener information
(appropriate for wall type) located in Table 1.
8.
Proceed to
Fastener Installation Methods
section at end
of Installation Instructions.
Figure 19
25
4
5
(DD) x 2
7
Cable
tie anchors
8
Tab
USB port
3
Bosses
6
(EE)
3
Screen
Attach to wall
through this slot
4
7
5