Installation Instructions
AN2 Series
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
1/8" (wood)
#1, #2
1/2" (drywall)
8mm (concrete)
6mm (concrete - AF6 toggler)
7/16"
3/8"
7/16"
3/8"
GG (1)
[Whiteboard]
A (1)
T (1)
[Projector interface]
S (1)
[Boom projector mount]
J (4)
K (4)
R (8)
[4" cable tie]
1/4 x 2-1/2"
Hilti Hud-L #8 x 60
H (4)
1/4-20 Snap toggle
L (10)
10-24 x 1/4"
CC (2)
#8 x 1/2"
Z (4)
#8-9 x 1-1/2"
DD (2)
#4-24 x 1/4"
HH (1)
[Marker kit]
EE (1)
FF (1)
[Marker tray]
C (1)
[Left valence bracket]
D (1)
[Right valence
E (1)
[Valence]
NN (1)
[IR Cable]
[Control panel
assembly]
BB (4)
Toggler AF6
MM (5)
[Whiteboard bracket]
[Upper wall
bracket]
B (1)
[Wall hanging
bracket]
bracket]
9200-003827
9200-003805
9200-003817
F (4)
1/4-20 x 1-3/4"
G (4)
1/4"
M (4)
10-24 x 3/8"
N (1)
[Boom spacer]
P (1)
5/16"
Q (1)
5/16"
U (1)
[Sensor cover]
V (4)
M4 x 12mm
X (4)
10-24 x 1-3/4"
Y (1)
5/32"
AA (2)
3/16"
OUTSIDE
BOX
PP (4)
[Leveling feet]
JJ (5)
#8 x 1/2"
KK (5)
Toggler AF6
LL (5)
#8 x 1-1/2"
QQ (2)
[Calibration marker
spacer]
W (2)
M4 x 30mm
[includes 2
extra]