Installation Instructions
AN2 Series
7
Installing Wall Bracket
1.
Slide the tabs on the upper wall bracket (A) into the slots on
wall hanging bracket (B). (See Figure 2)
Figure 2
2.
Install one fastener (See Table 1) into previously drilled
hole, leaving 1/2" of fastener extending from wall. (See
Figure 3)
3.
Hang wall bracket assembly onto fastener. (See Figure 3)
NOTE:
Notch in wall bracket assembly indicates center of
whiteboard.
Figure 3
4.
Level wall bracket assembly.
5.
Tighten fastener against wall bracket. (See Figure 3)
6.
Determine location of studs behind drywall, and mark a
minimum
of two locations for wall bracket attachment over
studs. (See Figure 4)
NOTE:
For wood or steel stud walls, mark at least two locations
for attachment a minimum of 16" apart and a maximum
of 24" apart, AND within slots on wall bracket
assembly.
NOTE:
For concrete walls, mark at least two locations for
attachment a minimum of 16" apart, AND within slots
on wall bracket assembly.
7.
Drill one pilot hole (see Table 1 for size) at each location
marked in Step 5 (See Figure 4) and follow fastener
information (appropriate for wall type) located in Table 1.
Figure 4
NOTE:
Proceed to
Fastener Installation Methods
section at
end of Installation Instructions.
8.
Fasten wall bracket assembly to wall using fasteners
appropriate to wall type (See Table 1). (See Figure 4)
(view from back)
tabs
tabs
(view from front)
(B)
(A)
(A)
(B)
Notch indicates
center of screen
Fastener
4
2
3
Fasteners
8
7
6
(2 or 3)