Maintenance 14. Replacing the M/C Cable
C12 Rev.3
287
Installation: M/C cable
1.
Install the connector sub plate.
For details, refer to
Maintenance: 3. Covers
.
2.
Connect the connectors of the new M/C cable to these of the cable unit.
Connector: X11, X12, X14, BR010, X010, X020, X040, LED, GS01
3.
Install the connector plate.
For details, refer to
Maintenance: 3. Covers
.
4.
Connect the following connectors to the Controller.
Power cable connector
Signal cable connector
5.
Turn ON the Controller power.
6.
Check operation to see if the Manipulator's position and posture are out of position.
Move the Manipulator to two or three points (poses) of the registered points.
7.
If the battery connector (BT1*) was disconnected, calibrate the Joint #1.
For details, refer to
Maintenance: 16. Calibration
.
8.
If the Manipulator is off position, calibrate all the joints and axes.
For details, refer to
Maintenance: 16. Calibration
.
Summary of Contents for C12 Series
Page 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C12 series Rev 3 ...
Page 8: ...vi C12 Rev 3 ...
Page 14: ...Table of Contents xii C12 Rev 3 ...
Page 16: ......
Page 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Page 84: ......
Page 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Page 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Page 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...