Setup & Operation 3. Environment and Installation
C12 Rev.3
31
When using the Manipulator in the clean room, follow the steps below before the installation.
(1)
Unpack the Manipulator outside of the clean room.
(2)
Secure the Manipulator to delivery equipment such as a pallet with bolts so that the
Manipulator does not fall over.
(3)
Wipe off the dust on the Manipulator with a little alcohol or distilled water on a lint-
free cloth.
(4)
Transport the Manipulator into the clean room.
(5)
Secure the Manipulator to the base table.
Summary of Contents for C12 Series
Page 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C12 series Rev 3 ...
Page 8: ...vi C12 Rev 3 ...
Page 14: ...Table of Contents xii C12 Rev 3 ...
Page 16: ......
Page 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Page 84: ......
Page 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Page 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Page 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...