Maintenance 10. Greasing and Replacing the Ball Screw Spline Unit
176
E2C Rev.6
(18) Grease the shaft.
For details on the greasing method, refer to
Maintenance: 10.3. Greasing the Ball
Screw Spline Unit
.
(19) Turn OFF the Controller and peripheral equipment. Install the end effector and
bellows, and connect wires and tubes to the end effector.
(20) Perform the calibration of Joints #3 and #4.
For details on the calibration method, refer to
Maintenance: 14. Calibration
.
Summary of Contents for E2C Series
Page 1: ...SCARA ROBOT E2C series MANIPULATOR MANUAL Rev 6 EM069R1409F ...
Page 2: ...MANIPULATOR MANUAL E2C series Rev 6 ...
Page 8: ...vi E2C Rev 6 ...
Page 14: ......
Page 82: ......
Page 92: ...Maintenance 2 General Maintenance 80 E2C Rev 6 ...
Page 118: ...Maintenance 4 Replacing the Cable Unit 106 E2C Rev 6 ...
Page 194: ...Maintenance 11 Replacing the Signal Relay Board 182 E2C Rev 6 ...