Maintenance 2. General Maintenance
E2C Rev.6
73
2. General Maintenance
Performing the inspection steps properly is essential to preventing trouble and maintaining
safety. This section describes schedule for maintenance inspection and the procedures.
Be sure to perform the maintenance inspection in accordance with the schedule.
2.1 Schedule for Maintenance Inspection
Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and
annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points
must be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.
Inspection Point
Daily
inspection
Monthly
inspection
Quarterly
inspection
Biannual
inspection
Annual
inspection
1 month (250h)
√
2 months (500h)
√
3 months (750h)
√
√
4 months (1000h)
√
5 months (1250h)
√
6 months (1500h)
√
√
√
7 months (1750h)
√
8 months (2000h)
√
9 months (2250h)
√
√
10 months (2500h)
√
11 months (2750h)
√
12 months (3000h)
√
√
√
√
13 months (3250h)
Insp
ect ever
y
da
y
√
…
…
…
…
…
…
h = hour
Summary of Contents for E2C Series
Page 1: ...SCARA ROBOT E2C series MANIPULATOR MANUAL Rev 6 EM069R1409F ...
Page 2: ...MANIPULATOR MANUAL E2C series Rev 6 ...
Page 8: ...vi E2C Rev 6 ...
Page 14: ......
Page 82: ......
Page 92: ...Maintenance 2 General Maintenance 80 E2C Rev 6 ...
Page 118: ...Maintenance 4 Replacing the Cable Unit 106 E2C Rev 6 ...
Page 194: ...Maintenance 11 Replacing the Signal Relay Board 182 E2C Rev 6 ...