Maintenance 12. Lithium Battery
166
G3 Rev.14
Battery board
Installation
(1) Mount the new battery board and secure it with
screws.
2-M4
×
15
Battery board
2-M4
×
12
(2) Connect the connectors.
Connectors: X61, X62, X63, X64
Battery board
X61
X62
X63
X64
(3) Fix the connector cable with wiring tie.
Refer to
Removal step (4)
.
(4) Mount the arm top cover.
For details, refer to
Maintenance: 3.1 Arm Top Cover
.
(5) Turn ON the Controller.
(6) Perform the calibration of all joints.
For details, refer to
Maintenance: 14. Calibration
.
Summary of Contents for G3 Series
Page 1: ...Rev 14 EM183R3623F SCARA ROBOT G3 series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL G3 series Rev 14 ...
Page 8: ...vi G3 Rev 14 ...
Page 14: ......
Page 84: ...Setup Operation 5 Motion Range 72 G3 Rev 14 ...
Page 86: ...74 ...
Page 200: ...Maintenance 15 Maintenance Parts List 188 G3 Rev 14 ...