M200 / M205 / M100 / M105 Series
Revision A
Disassembly/Reassembly
Detailed Disassembly/Reassembly Procedure for each Part/Unit
47
Confidential
Scanner Motor Gear Cover (M200/M205 Series)
Remove the Scanner Motor Gear Cover by removing the screw
securing the Scanner Motor Gear Cover to release the hooks (x2) of
the Scanner Motor Gear Cover.
Scanner Motor Gear Cover
C.B.P-TITE SCREW 3x10 F/ZN-3C (6 ± 1 kgf·cm)
Hook
Scanner Motor Gear Cover
Housing Left / Housing Right (M200/M205 Series)
When releasing the hooks (x14) of the Housing Left/Housing
Right, be careful not to damage the hooks (x14).
Release the hooks shown above when removing the Housing Left/
Housing Right.
Housing Right
Housing Left
Hook
Housing Rear (M200/M205 Series)
When removing the Housing Rear, follow the procedure below.
1. Remove the screw (x1) of the Housing Rear.
2. Press the section A on the Housing Left and release the dowels (x2) of the Housing Left from the Housing Rear, and lift the rear side of the
Housing Rear slightly to release the section B from the Housing Left.
3. Pull and turn the section C of the Housing Rear slightly to the front to release it from the gap between the Housing Right and Frame Base.
4. Slide the Housing Rear in the direction of the arrow to release the section D, and remove the Housing Rear while avoiding the Hopper and
Scanner Unit.
C.B.P-TITE SCREW 3x10 F/ZN-3C (6 ± 1 kgf·cm)
Step 2
Section A
Section B
Section D
Section C
Step 3-4
Step 1
Housing Rear
Dowel
Rib
Housing Rear
The section enclosed in red dotted line may be
interfered with the Hopper or the Scanner Unit.
Housing Right
Housing Left
Housing Upper Assy (M100/M105 Series)
Remove the Housing Upper Assy by releasing the hooks (x2) and
ribs (x3) shown in the figure above.
Tighten the screws in the order indicated in the figure above.
3
4
2
Housing Upper Assy
Hook
Rib
1
C.B.P-TITE SCREW 3x10 F/ZN-3C (6 ± 1 kgf·cm)
Waste Ink Pad Assy
When installing the Waste Ink Pad Assy, follow the procedure below.
1. Place the Waste Ink Pad Assy under the Frame Base.
2. Slide the Waste Ink Pad Assy in the direction of the arrow to
align the hole of the Waste Ink Pad Assy with the hook of the
Frame Base.
3. Confirm the following first, and then tighten the screw to
secure the Waste Ink Pad Assy.
•
The rib of the Waste Ink Pad Assy is correctly inserted into
the hole of the Frame Base.
•
The Waste Ink Pad Assy is secured firmly with the hook of
the Frame Base.
Bottom
Hook and hole
Frame Base
Waste Ink Pad Assy
Rear
Rib and hole
C.B.P-TITE SCREW 3x10 F/ZN-3C (6 ± 1 kgf·cm)
PS Unit
Be careful not to damage the rib of the Frame Base when widen the
rib to release the hook of the PS Unit.
When removing the PS Unit, follow the procedure below.
1. Using a precision screwdriver or the like, widen the rib of the
Frame Base to release the hook of the PS Unit.
2. Remove the PS Unit from the Frame Base in the direction of
the arrow while releasing the rib of the PS Unit.
3. Disconnect the PS Unit cable from the connector on the PS
Unit and remove the PS Unit.
PS Unit
Hook
Rib
Bottom
Widen this rib to release the hook of PS Unit.
PS Unit cable
Housing Front (M200/M205 Series)
Tighten the screws in the order indicated in the figure above.
Housing Front
1
2
C.B.P-TITE SCREW 3x10 F/ZN-3C (6 ± 1 kgf·cm)
Summary of Contents for M200
Page 1: ...SERVICE MANUAL CONFIDENTIAL Color Inkjet Printer M200 M201 M205 M100 M101 M105 SEMF12 012 ...
Page 9: ...Confidential CHAPTER 1 TROUBLESHOOTING ...
Page 18: ...Confidential CHAPTER 2 DISASSEMBLY REASSEMBLY ...
Page 59: ...Confidential CHAPTER 3 ADJUSTMENT ...
Page 73: ...Confidential CHAPTER 4 MAINTENANCE ...