Chapter 3 Installation and Configuration
S5U13719P00C100 Evaluation Board User Manual (Rev. 1.1)
EPSON
9
JP1-JP4 and JP7-JP9 - Power Supplies for S1D13719
JP1-JP4 and JP7-JP9 can be used to measure current consumption of each S1D13719 power supply.
When the jumper is at position 1-2, normal operation is selected.
When no jumper is installed, the current consumption for each power supply can be measured by connecting an
ammeter to pin 1 and 2 of the jumper.
The jumper associated to each power supply is as follows:
JP1 for COREVDD
JP2 for PLLVDD
JP3 for HIOVDD
JP4 for PIOVDD
JP7 for CIO1VDD
JP8 for CIO2VDD
JP9 for SIOVDD
Figure 3-2: Configuration Jumper Locations (JP1-JP4 and JP7-JP9)
JP1
JP2
JP3
JP4
JP7
JP9
JP8