SC-S30600 Series
Revision B
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
134
Confidential
3.4.5.9 CR Motor
1.
2.
Remove the Media Loading Lever.
3.
Remove the Right Upper Cover.
4.
Remove the Left Rear Cover.
5.
Remove the Left Upper Cover.
6.
Remove the Left Cover.
7.
Remove the APG Unit.
8.
Loosen the two screws (A) that secure the pulley holder.
9.
Loosen the screw (B) to loosen the tension of the CR Timing Belt.
Figure 3-83. Loosening the CR Timing Belt Tension
A D J U S T M E N T
R E Q U I R E D
When replacing/removing this part, refer to
Items and the Order by Repaired Part” (p200)
and make sure to
perform the specified operations including required adjustment.
C H E C K
P O I N T
Before loosening the tension at the next step, mark the position of
the pulley holder to make the required adjustment easier.
A
B
A
- Left side -
Pulley Holder
Summary of Contents for SC-S30600
Page 1: ...SC S30600Series Large Format Color Inkjet Printer SERVICE MANUAL SEIJ11002 Confidential ...
Page 9: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 33: ...Confidential C H A P T E R 2 TROUBLESHOOTING ...
Page 61: ...Confidential C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Page 198: ...Confidential C H A P T E R 4 ADJUSTMENT ...
Page 276: ...Confidential C H A P T E R 5 MAINTENANCE ...