EPSON Stylus COLOR 860/1160
Revision C
Disassembly and Assembly
Disassembly Procedures
106
7) Move the PG Lever to bring its hooks to the wider areas of the cutouts in
the right side of the Top Frame. Then remove the PG Lever by releasing
the hooks.
Figure 4-46. Setting
the Two Hooks
8) Using tweezers, remove the Torsion Spring 63.7 hung onto the right side of
the Top Frame and PG lever. Refer to Figure 4-47.
9) Release the fixed hook of the PG Lever Support, then remove the PG
Lever Support and Disk Spring (6.2x0.15x1, S/NA) from the right end of the
CR Guide Shaft. Refer to Figure 4-47.
Figure 4-47. Removing the Torsion Spring 63.7 & PG Lever
10) Remove one screw (No.7) and rotate the Right Parallelism Adjustment
Bushing and move it forward to align the locking protrusion of the Right
Parallelism Adjustment Bushing with the notches in the right side of the
Top Frame.
Figure 4-48. Removing the Right Parallelism AD Bushing
PG Lever
Bring the hooks to
these areas.
Right side of the
Top Frame
Torsion Spring 63.7
PG Lever Support
Disk Spring
No. 7 Screw
C A U T I O N
Be careful when removing the Right Parallelism Adjustment
Bushing. If you remove it with the printhead installed, the CR
Unit will fall to the platen.
Right Parallelism
Adjustment Bushing
Notches in the Top
Frame
Summary of Contents for Stylus COLOR 1160
Page 8: ...C H A P T E R PRODUCTDESCRIPTION ...
Page 28: ...C H A P T E R OPERATINGPRINCIPLES ...
Page 53: ...C H A P T E R TROUBLESHOOTING ...
Page 74: ...C H A P T E R DISASSEMBLYANDASSEMBLY ...
Page 116: ...C H A P T E R ADJUSTMENT ...
Page 150: ...C H A P T E R MAINTENANCE ...
Page 160: ...APPENDIX C H A P T E R ...