EPSON Stylus CX3100/3200
Revision A
Disassembly and Assembly
Disassembly of Printer
55
C A U T I O N
Install the Shield Cover on the Main Board so that the USB
connector is held in the Shield Cover. (See below)
Connect the power supply cable on the secondary side to the
Main Board so that the blue-band cable end is positioned at pin
1 as shown below.
When installing the Main Board in the Printer Mechanism
Unit, engage the Main Board with the hooks on the Mechanism
Unit as shown below.
A D J U S T M E N T
R E Q U I R E D
Once you have replaced the Main Board with a new one, make the
following adjustments:
Destination Setting (EEPROM Initialization) (See p.61)
Top Margin Adjustment (See p.66)
First Dot Position Adjustment (See p.67)
A D J U S T M E N T
R E Q U I R E D
When you have removed once and installed the Main Board, make
the following adjustments:
There may be cases where the contents of EEPROM on the Main
Board can be read, for example, when only the motor driver has
broken down. In such cases, to shorten repair time, you can back
up only the adjusted values by executing the following operation
and download the adjusted values onto the newly installed Main
Board.
Summary of Contents for Stylus CX3100
Page 1: ...EPSON StylusCX3100 3200 Scanner Printer Copier SERVICE MANUAL SEOT02002 ...
Page 5: ...Revision Status Revision Issued Date Description A Augusut 1 2002 First Release ...
Page 8: ...C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 13: ...C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 17: ...C H A P T E R 3 TROUBLESHOOTING ...
Page 34: ...C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 57: ...C H A P T E R 5 ADJUSTMENT ...
Page 74: ...C H A P T E R 6 MAINTENANCE ...
Page 80: ...C H A P T E R 7 APPENDIX ...
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ...EPSON Stylus CX3100 3200 Revision A Appendix Exploded Diagrams 88 7 4 Exploded Diagrams ...
Page 90: ...EPSON Stylus CX3100 3200 Revision A Appendix ASP List 89 7 5 ASP List ...