4.2.3.8 Removing the CR Motor / Pulley ASSY
1.
Remove the R Side Cover as described in “R Side Cover Removal 124.
2.
Remove the L Side Cover as described in “L Side Cover Removal 124.
3.
Remove the cable connector of the CR Motor (Lock type).
Figure 4-112.
4.
Loosen the CR Tension shaft on the right side of the printer to release the tension on
the CR Steel belt. (Loose two screws with same amount.)
Figure 4-113.
5.
Loosen the set screw on the shaft clamp.
Figure 4-114.
C H E C K
P O I N T
Before loosening the CR timing belt tension, confirm and write down
the current tension. See “CR Timing Belt Tension Adjustment” for
information on confirming the tension.
Connector
Screw
Pullry
CR steel belt
Set screw
Shaft clamp
Summary of Contents for Stylus Pro 10000 Series
Page 7: ...Revision Status ...
Page 8: ...Revision Issued Date Description Rev A March 30 2001 First Release ...
Page 13: ...C H A P T E R PRODUCTDESCRIPTION ...
Page 59: ...EPSON Stylus Pro 10000 10000CF Revision B Product Description Jumper Settings 59 ...
Page 60: ...C H A P T E R OPERATINGPRINCIPLES ...
Page 86: ...C H A P T E R TROUBLESHOOTING ...
Page 113: ...C H A P T E R DISASSEMBLY ASSEMBLY ...
Page 187: ...C H A P T E R ADJUSTMENT ...
Page 276: ...C H A P T E R MAINTENANCE ...
Page 289: ...C H A P T E R APPENDIX ...
Page 315: ......
Page 316: ......
Page 317: ......
Page 318: ......
Page 319: ......
Page 320: ......
Page 321: ......
Page 322: ......
Page 323: ......