19
ADJUSTMENT OF THE DRIVE WHEEL
•
Set the contact height of the drive wheel so that it just touches the centre wheel when the tine
units just touch the ground.
•
The drive wheel pressure must be set at 2 Bar.
3.4 CONFIGURATION OF THE DISTRIBUTION SYSTEM
Equalizer airseeders are equipped with 2, 4 or 6 outlet metering units. This implies that 2, 4 or 6
main lines of 63 mm pipes can be set up to transport fertilizer or seed. The latter can be further
divided to serve a different number of rows. It is done through secondary divider heads.
The number of rows that the metering unit can service, are set out in the table below:
Secondary Divider Heads: Amount of outlets per divider head
( 2 outlet serves 50mm pipe, the rest serves 32mm pipe)
2
5
6
7
8
9
10
11
12
2 Outlet
Metering unit
4
10
12
14
16
18
20
22
24
4 Outlet
Metering unit
8
20
24
28
32
36
40
44
48
6 Outlet
Metering unit
12
30
36
42
48
54
60
66
72
3 Outlet Divider Head 4 Outlet Divider Head 5 to 12 Outlet Divider x 32mm Pipe
•
It is possible to close off 1,2 or 3 compartments in the 4 and 6 outlet metering units, and only use
the remainder of the open lines.
•
It is possible to block off some of the outlets on the 32mm divider heads as long as the total
number of open outlets is not less than 5.
•
In cases where the seed or fertilizer depositors are below ground level, ventilators need to be
incorporated in order release surplus airflow.
•
Under no circumstances should the 63 mm pipes be split before they reach the divider heads,
and likewise, the pipes from your divider heads to your planter units may not be split.
Summary of Contents for Econo 10000
Page 1: ...OPERATOR MANUAL 3 SECTION MIN TILL AIRSEEDER 4500E 7500E...
Page 7: ...7 SAFETY SIGNS...
Page 8: ...8...
Page 30: ...30 9 PROBLEM SOLVING...
Page 31: ...31...
Page 32: ...32...
Page 33: ...33...
Page 34: ...34...