1
Recommended Service Schedule
We recommend doing the first preventative maintenance at about 30 service hours. Following this service,
select maintenance tasks should be performed monthly, every six months, and so forth. Please refer
to Index B: Service Checklist for a comprehensive list of preventative maintenance tasks and when to
complete them.
Replacement Parts
Use only manufacturer-recommended replacement parts. Other parts may be substandard in fit and
quality.
For additional replacement parts, contact the service provider (Index A).
Maintenance Precautions
Always take proper safety precautions while servicing this equipment. For complete RB4000 safety
and operation guidelines, refer to the Operator’s Manual. If you do not have a manual, contact the
manufacturer’s recommended service provider.
Always perform maintenance when the vehicle is level.
Never do any maintenance or adjustments while the equipment is operating. Turn off the engine when
performing maintenance to prevent accidental movement.
Never perform maintenance on this machine unless the dump box is completely in the transport position
(fully retracted and lowered). To perform maintenance under the dump box, the box can be tilted in the
dump position. It must be secured with the support arm in place. Never perform maintenance with the
dump box in the lifted position.
Make sure all operating and residual pressures are relieved before working on a hydraulic system.
Shut engine off and operate all the controls to relieve any pressure.
Replace all safety shields and guards when finished performing maintenance. Do not operate the
equipment with protective equipment removed.
Summary of Contents for RB4000
Page 1: ...R B 4 0 0 0 S E R V I C E M A N U A L ...
Page 2: ......
Page 12: ...8 ...
Page 15: ......