7
Unpacking
Check that all the parts are present and undamaged. Any suspicion of damage or shortage should
be reported to your dealer or Winncare Nordic ApS. We recommend that the box packaging is
kept if the mobile hoist is to be used on other sites or for return shipment in case of repair or
annual check.
Content of the box:
1.
Base Unit
2.
Mast and lifting arm with
spreader bar
3.
Actuator
4.
Hand control
5.
Control box
6.
User instruction
Assembly instruction
Following step by step the assembling guidance:
1. Place the base unit on the floor and
brake the wheels. (Fig. 1.6A)
2. Assemble the mast/lifting arm to the base
and tighten the hand screw. (Fig 1.6B +
1.6C)
Fig. 1.6A
Fig. 1.6B
Fig. 1.6C