Operation Manual
Version: 12/01
11
er900 PC Operation Manual
Art-Nr: 475.156
Ergometer
Type
er900 PC
3.
Installation
This section describes the required installation steps in order to establish operational
readiness. The steps described are also required at initial installation after delivery of
the device.
3.1
Installation steps
1) Loosen screws and clamp lever for clamp fixture, and remove upper clamp jaw;
Insert handlebar, secure, and screw tight with screws and clamp lever.
Adjust appropriate handlebar position and fix position with clamp lever.
2) Insert measurement head with the tin flaps into the handlebar pipe;
Attach grounding cable, connection cable and tubing.
3) Adjust black rear cover onto the measurement head and tighten with screw.
4) Insert saddle pipe into the guidance and tighten with clamp lever.
5) Feed saddle bellows into the saddle pipe, and put on to the intended notch .
6) Connect blood pressure cuff according to 4.3.2 at the measurement head.
7) Connect mains cable according to 4.3.1 at the power inlet.
3.2
Scope of Delivery
The standard scope of delivery consists of :
Installation
1
blood pressure cuff
3
handle bar
4
Measurement head with rear cover
5
saddle bar with saddle
not in picture:
mains cable, 5 m
Final test protocol
Operation Manual
optional
:
connecting cable to ECG
(not in picture)
1
3
4
5