EZ 1000 Series II Melter Part Manual
Chapter 5 Operating Instructions
©2019 by Crafco, Inc. All Rights Reserved………………..…………………………………..….Operating Instructions 5-12
5.10 Loading Material into the Sealant Tank
This unit is equipped with a safety interlock system on the loading door. This system disables the
mixer hydraulic system when the lid is open to stop the mixer from turning. This is a safety feature
for the operator and should never be disabled for any reason.
CAUTION
Personal injury could occur if this safety system is disabled.
Step
Action
WARNING
Following this procedure prevents hot material from getting on operators and causing
severe burns. Never throw blocks of material directly into tank. Hot material splash
hazard will result.
1
To load material into the sealant tank first open the lid.
2
Place the solid material on the lid then close the lid.
3
Continue adding solid material at intervals to allow the mixer to rotate without
jamming.
Note:
If blocks of solid material are added too quickly, jamming results and slows
down the melting process.
Note:
When sealant placement volume is low, or the crew has stopped working for
lunch hot oil and material temperatures can equalize. To lower material temperature
add a few blocks of cold sealant. This may not be an option if the tank is full.
Table 5-12 Loading Material into the Sealant Tank
Summary of Contents for Crafco 46200EB
Page 1: ...Parts Manual 26458 Revision Q ...
Page 16: ......
Page 18: ......
Page 26: ......
Page 48: ......
Page 66: ......
Page 196: ......
Page 200: ......
Page 201: ......
Page 202: ... 2019 Crafco Inc ...