Unlicensed LPWA Gateway 5780
1/1553-KRC 161 673 UEN Rev PB9 2017-03-24
Ericsson AB 2017
8 (45)
Commercial in confidence
3.2
Conditions
The conditions in this section must be fulfilled before work starts.
3.2.1
Before Going to the Site
Before going to site, make sure below items are available:
Site access permission has been received.
Documentation stated in section 2,
‘Safety Information’ is available.
All applicable tools stated in section, 3.1
‘
Required Tools
’
are available
3.2.2
Before Starting the Installation
Before starting the installation, make sure below list is completed:
The site is prepared per the
Site Installation Documentation
.
The ordered hardware is available.
The power supply for the gateway is installed and tested at the
gateway site.
The site grounding system is installed and tested.
Either of the following alternatives must be installed and tested:
- A main switch and an external fuse
- A circuit breaker
4
Unpack and Check Materials
The gateway components are transported in corrugated boxes. Do not
dispose of the packaging as it can be required to return faulty equipment.
Steps
To unpack and check the materials, do the following: