EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
113 (200)
c.
In the “
Ne Name”
column the template will load the default OOB IP
address of 150.150.150.4, the Node being commissioned is likely to have a
different one allocated to it. The Out Of Band IP Address is determined by
the DLE ID, refer to Section 5.5. Change the address (if necessary) in this
column for all entries, as follows:-
Change the 1
st
entry in this column to the correct IP address, select the 1
st
entry, then left-click the 1
st
entry & drag down to the bottom of the column
to highlight all entries. Right click & select “
Replicate cell
”, all entries in the
“
Ne Name”
column will now be set to the required OOB IP Address.
d.
In the “
Command
” column, set all entries to “
modify
”, as follows:-
Double click on the 1
st
entry in this column and from the drop-down list
select the “
modify
” option. Select the 1
st
entry, then left-click & drag down
to the bottom of the column to highlight all entries. Right click & select
“
Replicate cell
”, all entries in the “Command
”
column should now be set to
“
modify
”. Check that all entries have been changed correctly.
e. Select
“
Apply All Rows
” from the bottom LHS of the screen.
f. Select
the
“
Read Network
” function to store all entries, confirm the
configuration has been built. Four data rates (Bytes per Round) are
created per port, these are 1500, 50000, 40000 and 10000.
g.
If other ADSL or SHDSL cards are to be configured then repeat steps b. to
f. above for each additional unit. Being very careful to select the
appropriate ADSL or SHDSL folder and load the correct file for the specific
slot position.
h.
Exit all windows to return back to the main LCT screen.