EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
153 (200)
9
Test ADSL2+, POTS, SHDSL & Connection
Units
9.1
Configure/Activate/Test 64 Port Adsl2+ Units
This section details the functional checks for alignment of the xDSL modems to the
xDSL lines equipped in the subrack (if testing is required). If xDSL testing is not
required, skip this section.
The
64 x ADSL
lines are grouped as 1 to 4, 5 to 8, 9 to 12, 13 to 16, 17 to 20, 21 to
24, 25 to 28, 29 to 32, 33 to 36, 37 to 40, 41 to 44, 45 to 48, 49 to 52, 53 to 56, 57 to
60 and 61 to 64. One ADSL Line should be tested from each group of four lines.
This will ensure that each line IC is tested.
Proceed by configuring all 64 lines, then activate
All
selected lines per ADSL unit,
then checking (on a sample of sixteen ADSL lines per unit, selecting one line per
group of 4 lines) that by connecting an xDSL modem at the MDF, all aligning
operations are carried out and these operations are detected by the LCT.
9.1.1
Check 64 x ADSL Cards for ADSL2 + Configuration
a.
Place the cursor on the <
64 x ADSL unit >
to be checked.
b.
Right click on the unit and select
Lines
from the menu.
c.
When the ADSL x 64 Lines window appears click on the first
ADSL Line
to
be checked then left click on the
Configure
button.
d.
Click on the
Configuration
tab.