EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
194 (200)
EDA 2530 Handover and Acceptance (now sec 11 was sec 12)
Appendix (now sec 12 was sec 13)
Test Records (now sec 13 was sec 14)
Document change request (now sec 14 was sec 15)
Glossary of terms (now sec 15 was sec 16)
References (now sec 16 was sec 17)
Change information (now sec 17 was sec 18)
PA4
19-02-2009 Fourth Draft Issue
Sec 5.5; “Restore CP card to factory default” section removed, this is
unnecessary since the CP card’s CF is reprogrammed in previous section
5.2. Subsequent sub-sections in Sec 5 renumbered.
Sec 7.5; “Adding Interfaces To The Static VLANs”, added extra step c. For
additional ADSL cards, the “intlag” interfaces are built into the Data VLAN.
Sec 10 & 11; “Network Integration” section and “EDA Handover And
Acceptance” section deleted, these are now included in the EDA 2530
Migration procedure. Subsequent sections are renumbered.
PA5
21-02-2009 Fourth Draft Issue
Sec 5.6; “Software Inventory Check” – updated the inventory screens.
Sec 6; “Software Download/Upgrade” – updated the System Software
Download screens.
Sec 7.10; “xDSL Bridge Management – Configure PVC” – Added slot 10 ,
12, 14, 16, 18, & 20 configuration files to step b. Also added slot xDSL10
slot 20 column to C-VLAN id table.
Sec 7.11; “xDSL Bridge Management – Downstream Flow Assignement” -
Added slot 10 , 12, 14, 16, 18, & 20 configuration files to step b.
Sec 9.4; “End of Stand Alone Configuration/Testing” – Added extra step d.
for the on-site engineer to phone the NOC, who then wish to verify the
OOB Management prior to the equipment being powered down.
A 23-02-2009
First
Issue
Sec 11; Commissioning Test Record sheets corrected.
B
25-02-2009 Second Issue changes, following Norwich City migration.