EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
67 (200)
7
Configure IP and Ethernet Management
The following table gives a list of the site specific information required to commission
the EDA 2530, without this information the commissioning of the node cannot
commence. Most of this information is provided in the CWA “DLE planning”
spreadsheet, produced by CWA DLE Management.
CWA “DLE planning”
Ref.
Comissioning
Procedure/LCT
Ref.
Example / Comments
DSLAMID
Node DLE ID
eg EANCN0102 (Norwich North), this is
site specific.
Specified in site SID document.
OOB IP Address
(Out Of Band)
150.150.150.x
Where x=4 (default) to 15
Out Of Band IP Address is determined
by the DLE ID, refer to Section 5.5.
S-VLAN SVID
21 or 22
To be specified by CWA.
If parenting EDA2530 to an existing
EDA2510, will use the same value as
used by the EDA2510.
Parent EDA2530
3200 + y
Child#1 EDA2530
200 + y
Child#2 EDA2530
1200 + y
Child#3 EDA2530
2200 + y
C-VLAN CVID
Where y = 1 to 64 for xDSL ports 1 - 64
Where y = 1 to 32 for SHDSL ports 1 -
32
Mask Mask
Length
E.g. 30 or 31
Number of bits of subnet mask.
To be specified by CWA.
AHX IP Addr
IBM IP Address
In Band Management IP Address.
To be specified by CWA.
BRAS IP Addr
Route
Gateway
IP Address
To be specified by CWA.