EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
©
Ericsson AB 2010
Commercial in confidence
88 (200)
7.7.4
Complete VLAN Creation
a.
When only a single child is to be subtended from the “Parent” EDA 2530 ie
Child#1 (EDA2510 or EDA2530) from GigE Port 2, then exit back to the
main LCT screen at this point & continue to sub-section 7.8.
b.
If one or two child(s) ie Child#2, Child#3 (EDA 2530), are to be subtended
from the “Parent”:-
Then perform the sub-section 7.7.5, to create S-VLANs on the “Parent”
EDA 2530 to subtend a “Child#2” (if applicable).
Then perform the sub-section 7.7.6, to create S-VLANs on the “Parent”
EDA 2530 to subtend a “Child#3” (if applicable).
7.7.5
Create S-VLANs on the “Parent” to Subtend Child#2 (If required)
Note: This sub-section is only to be applied to the “Parent” EDA 2530 that is
subtending a “Child#2” (EDA 2530).
The last screen in the previous sub-section shows the “Parent” EDA 2530 with two
ADSL cards configured in slots 2 & 4, & two POTS cards configured in slots 3 & 5.
Whilst the S-VLANs for Child#1 (EDA 2510) subtended from GigE Port 2 are already
configured for port “
ethG//1/1/2
” by the template file.
To subtend Child#2 (EDA 2530) from GigE Port 3, the on-site engineer needs to add
the User Port Interface Name “
ethG//1/1/3”
for the following S-VLAN entries in the
table:-
•
DATA_INBAND
•
VIDEO
•
VOIP_GW1
•
VOIP_GW2
•
VOIP_GW3
•
VOIP_GW4
•
VOIP_GW5
•
VOIP_GW6
•
VOIP_GW7
•
VOIP_GW8
•
VOIP_GW9
•
VOIP_GW10
7.7.5.1
Create “DATA_INBAND” S-VLAN
a. Against
the
DATA_INBAND
S-VLAN Name, double left-click on the
“
ethG//1/1/2
” entry under the “User Port Interface Name” column.
b.
In the “VLAN Egress Ports…….” window select “
Read NE
”.
c.
Highlight the “
ethG//1/1/3
” entry