Installing the Hardware
2
Installing the Hardware
Figure 3
Fully Loaded 42 RU Rack Configuration
Decide where in the rack to position the chassis based on component stackup:
•
The chassis requires seven rack units (RUs). An RU is 1.75 inches (4.5 cm).
•
The optional AC power shelf requires one RU. It must be installed
immediately below the chassis.
•
A standalone external fuse panel requires one RU.
Caution!
Risk of equipment damage. Never install the chassis in a rack that has not
been stabilized by being bolted to the floor and to the ceiling and always
select a mounting position that is suitable to the type of rack in which the
chassis is being installed.
21
27/153 30-CRA 119 1170/1 Uen A
|
2010-04-09
Summary of Contents for SmartEdge 600
Page 1: ...SmartEdge 600 Router Hardware Guide Release 6 3 INSTALLATION 27 153 30 CRA 119 1170 1 Uen A ...
Page 6: ...SmartEdge 600 Router Hardware Guide 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Page 26: ...SmartEdge 600 Router Hardware Guide 20 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Page 108: ...SmartEdge 600 Router Hardware Guide 102 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...
Page 112: ...SmartEdge 600 Router Hardware Guide 106 27 153 30 CRA 119 1170 1 Uen A 2010 04 09 ...