Adjustments
Rev: 0-3 (international, serial no. 3010)
- 4-8 -
May 2006
To stretch the conveyor belt
•
Move back the driven roller by unscrewing adjustment bolts until there is enough tension in
the belt. You can judge the tension by touching the belt between the driven roller and the
rubber return roller under the conveyor. The belt should be a little slack in that position. If not,
the belt is too tight.
Note
: Belt overstretch or misalignment will cause premature belt wear.
To slacken the conveyor belt
•
Move forward the driven roller by screwing adjustment bolts.
To align the conveyor belt
•
Move back or forward only one of the adjustments of the drive roller by screwing or
unscrewing the adjustment bolt until the belt moves correctly.
•
When adjusting a fast turning short conveyor, never screw or unscrew the adjustment bolt
more than a ¼ turn at the time.
adjustment
lock nut
adjustment bolt
unscrew to tight belt
screw to slack belt
driven roller
Summary of Contents for Fingerscreener 206T
Page 73: ......
Page 79: ......
Page 81: ......
Page 83: ......
Page 85: ......
Page 87: ......
Page 90: ......
Page 93: ......
Page 96: ......
Page 100: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 131: ...7C 13 3 B 31 C 142 H6 HU VS MH HYDROMATIK A2FE 125 61W PZL100 MT713C033 23 06 2006 ...