1 | General information
Erme AG
8 / 58
Table models
1.3.2 Instructions for use
Instructions and system reactions
The work steps to be carried out by the operating personnel are described
consecutively. The order of the steps must be observed. The system reactions to the
respective operational steps are marked by an arrow.
Example:
ü
Requirement
1 Work step 1
ð
Reaction to work step 1
Lists
Lists without a mandatory order are displayed as a list with a preceding bullet point.
Example:
– Item 1
– Item 1, sub-item A
– Item 2
Lists with a mandatory order are displayed as a list with a preceding number.
Example:
1.
First
2.
Second
References to chapters/pages
References to specific chapters in which procedures and instructions are described
are illustrated as active links.