Instalacion_V.
00.fm -
14/3/16
DINGO operator for sliding gates
53
INSTALLATION
Connection of safety transmitter-receiver photocells in closing (SG.C)
Connection of safety transmitter-receiver photocells in opening (SG.A)
Connection to the mains
We recommend installing opening and closing
safety photocells.
1
Complete the connections as shown in the figure.
2
Duly programme the operator:
Closing photocells
with pre-testing
:
C511
Closing photocells
without pre-testing
:
C510
Without closing photocells:
C500
For further details on programming, see “Start up
and programming” on page 54.
We recommend installing opening and closing
safety photocells.
1
Complete the connections as shown in the figure.
2
Duly programme the operator:
Opening photocells
with pre-testing
:
C411
Opening photocells
without pre-testing
:
C410
Without opening photocells:
C400
For further details on programming, see “Start up
and programming” on page 54.
1
Connect the line cable (L) to the connection strip
lower cable connector and the neutral cable (N) to
the upper cable connector.
2
Connect the earth cable (T) to the operator frame.
3
Ensure the main fuse (F) is correctly in place.
Fuse (DNS424E): FUS 5x20, 2.5A
Fuse (DNS424EM): FUS 5x20, 4A
Never forget to connect the earth cable, in
order to prevent the risk of electrical discharge.
P275H