© ESAB AB 2011
- 12 -
bp16ea
5
OPERATION
General safety regulations for handling the equipment can be found on
page
4
. Read through before you start using the equipment!
5.1
Connections
1
Mains cable
4
Pre-filtered dry air supply
2
Input voltage selector switch
5
Torch
3
Fuse (2A)
6
Return cable with clamp
GB