11.
Stabilize the pole by using six 2X4’s and placing two 50 lbs.
bags of sand on top to keep pole from shifting, periodically
check the pole with level to ensure that pole is vertical.
See
Figure 5
.
12.
Let concrete stand for a
MINIMUM
of 48 hours (2 days).
Note: Periodically check pole with level to ensure that pole is vertical.
Figure 5
IMPORTANT!
Let concrete stand for a MINIMUM of 48
hours (2 days) before proceeding to the
next step. In humid climates or wet
weather, allow additional time for the
concrete to cure. Do not install anything
else until concrete is completely cured.
Sand bag
2 X 4’s
7