Page Mode
CAN-CBM-DP
Software Manual Rev. 2.0
49
6.4.4 Setup via Page 0 and 1
After the system has been started, the gateway has to transmit the length of the previously configured
page to the PLC. This is made by means of the so-called
page 1
.
For this the PLC has to transmit
page 0
to the gateway first. The gateway then returns the setup data
in page 1.
The product package contains a function block which is responsible for the transmission and reception
of pages 0 and 1 (FB2). We recommend that you use this function block. If you use function block FB2,
you do not have to configure further parameters.
The setup requires some time. Therefore it is recommendable to delay the transmission of the next page
for about 5 sec. It is, for example, possible to program a PLC timer which considers the delay.