background image

 No. 

4009304008720 

 
 

G-068C 2 

ESPEC 

CORP. 

5. Accessories 

 

 
Crescent clamps(for anchor)    : 1 
Chamber anchor bracket 

: 4 

Fall prevention bracket 

: 2 

Chamber fastening bracket fastening bolt (M6 x L12, washer): 8 
Fall prevention bracket fastening bolt (M8 x L20 bolt and washer): 4 
* Bolts for anchoring the chamber to the floor are not included in the accessories.   
These anchoring bolts (M12) must be provided by the customer. 
Installation instruction 

: 1 

 

 
6. Others 
        Recommend to use option Dew tray (No.: 40093010114xx    for stand). 
 
7. Setting water supply   
        Set the water supply method. For using L stand with water tank, select [Direct], if not using it, select   
        [Tank]. 
 

* This manual explains the instruction from the chamber controller and also the instruction using 
network. See “Network Web application”. 
 

Controller 

  There is Set water supply in the Set option in the maintenance. 

 

                   

 

 

 

Water supply settings 

 

 
 

 

WARNING

 

 

Entrust stand assembly, installation and disassembly to a professional 
installer who has received training from ESPEC CORP.

 

 

Stand handling involves dangerous work such as lifting heavy objects. 
Assembly and installation are subject to separate billing. For more information, 
contact your distributor or ESPEC CORP. 

Reviews:

Related manuals for G-068C