Page 6
G500-G525-I02-070214
Ventilation
Ventilation should be in accordance with National Regulations. In the United Kingdom,
purpose provided ventilation is not normally required, except in new build houses.
For Republic of Ireland refer to I.S813 issued by the National Standards Authority of
Ireland.
Gas Connection
The gas supply connection is at the right hand side of the stove on the gas valve.
A nut and olive (strapped to the valve body), tail pipe and a pressure test elbow are
supplied with the stove for easy connection.
The gas supply should incorporate a service tap, be purged and any loose matter
removed.
Connect the gas supply pipe and check for gas soundness.