![background image](http://html.mh-extra.com/html/estarmodels/pilatus-turbo-porter/pilatus-turbo-porter_instructions-manual_2429194004.webp)
z
FUSELAGE CONSTRUCTION
1.
Pin the longerons(F3, F14, F26)on the plan and
glue each other.
2.
Lay right side panel(F1a-F1c) on the plan.
3.
Temporary assemble right longerons(F2, F3&F26,
F4).
4.
Temporary assemble bulkheads(F5-F10), lower
longerons(F11) and battery tray(F12).
5.
Temporary assemble landing gear mount(B7).
6.
Assemble and glue wing joiner sockets(B4-B6).
Shape rear socket(B5) with sanding block as shown on
the drawings.
7.
Temporary assemble wing joiner sockets to the
bulkheads F7, F8.
8.
Temporary assemble left longerons(F2, F14, F4).
Cover the left side panel(F1a-F1c).
9.
Temporary assemble fore longerons(F19-F23).
Make sure to pay attention to bulkheads F17, F18 the
numbers should be facing forward.
Page 4