Select a suitable location for installation of the module. 
For optimum performance, the module must be facing true south in northern 
latitudes and true north in southern latitudes. 
For detailed information on optimal module orientation, refer to standard solar 
photovoltaic installation guides or a reputable solar installer or systems integrator. 
Shading on the module will reduce electricity production. 
Do not install the module near equipment or in locations where flammable gases 
can be generated or collected. 

Observe all instructions and safety precautions included with the mounting system 
to be used with the module. 
Do  not drill holes in the glass surface of the module. Doing so will void the 
warranty. 
Do not drill additional mounting holes in the module frame. Doing so will void the 
warranty. 
Modules must be securely attached to the mounting structure using four mounting 
points for normal installation. If heavy wind or snow loads are anticipated, 
additional mounting points should also be used. Please see the drawing below. 
Load calculations are the responsibility of the system designer or installer. 
The mounting structure and hardware must be made of durable, anti-corrosion 
and UV-resistant material.

4.1 Mounting with bolts

 

A minimum of four module clamps should be used, two on each long/short frame 

side, in the general clamping areas denoted by the wide arrows on the drawing. 

Other mounting methods are acceptable as long as the minimum requirements 

as described under term 4.2 mounting with clamping hardware are met.

If module clamps are used to secure the module, The torque should refer to 

mechanical design standard, we recommend the following torque for bolt:

M6------9 N.m

M8------16~20 N.m

 

3. MECHANICAL INSTALLATION

4. MOUNTING METHODS 

www.etsolar.com

3.1 Selecting the location 

3.2 Selecting the proper mounting structure and hardware 

4.2 Mounting with clamping hardware 

The module must be attached and supported by at least four bolts through the  
indicated mounting holes. 
Most installations will use the four inner mounting holes on the module frame. 
Depending on the local wind and snow loads, additional mounting points may be 
required.

Four or Eight pre-drilled mounting holes, located on the aluminum alloy frame, are 
provided for ease  of installation.  They are designed to be used with metric M8 
stainless steel screws. We recommend  to use a tighten torque of 16~20 N.m

Mounting hole installation

Use four mounting holes

snow load 2400Pa/wind load 2400Pa

Use four mounting holes

snow load 5400Pa/wind load 2400Pa

Summary of Contents for ET SOLAR Series

Page 1: ...ER ET SOLAR CHINA Please consult your dealer or the manufacturer concerning the warranty of your modules If you have any further questions your dealer and ET Solar will gladly assist you Tel 86 25 868...

Page 2: ...c systems requires specialized skills and knowledge The installer assumes all risk of injury including risk of electric shock Module installation should be performed only by qualified persons All modu...

Page 3: ...ction box has a breather port which must be mounted facing downward and cannot be exposed to the rain The junction box should be on the higher side of the module when it is mounted in order to orient...

Page 4: ...of the system designer or installer The mounting structure and hardware must be made of durable anti corrosion and UV resistant material 4 1 Mounting with bolts A minimum of four module clamps should...

Page 5: ...area 35mm by 100mm surrounding the grounding hole and keep it dry Choose either one of the two options described in the diagrams above to properly ground the module Spray varnish on the yellow portion...

Page 6: ...rocarbon varnish or other chemicals please follow the instructions strictly personal protective equipment such as goggle mask gloves etc may be needed during the operation No photovoltaic module shoul...

Page 7: ...cal connections between wet soiled or otherwise faulty connectors Faulty connections can result in electrical shocks and arcs Expect for equipment grounding ET Solar recommends the negative pole of PV...

Page 8: ...e they are well connected into the PV system Then check the modules one by one as below Measure the open circuit voltage of a module Cover the module completely with opaque material Disconnect the mod...

Page 9: ...installation operation use or maintenance Improper installation operation use or maintenance means that installation operation use or maintenance does not strictly follow this manual and or the local...