Installation
Connect the precipitator with the boiler
13
Fasten the flue gas connection with a new seal to the
precipitator.
Install piping for the flue gas
Install the flue pipe with hexagonal screws and a new
seal on the boiler.
Mount the flue pipe between the boiler and precipitator.
Seal all connectors with aluminium adhesive tape and
then attach with pipe clamps.
If the precipitator is installed on the opposite side,
the flue pipe must be shortened.
Attach the temperature sensor for the flue gas to the
connection in the connecting pipe.
Put the insulation over the flue pipe and attach
aluminium adhesive tape to the piles.
Route cables to the boiler
The cables for the power supply, CAN-Bus, earthing
and draught fan already protrude from the precipitator
panel. Route these cables to the boiler via the
cable duct.
Summary of Contents for EEP 130
Page 30: ...www eta co at ...
Page 31: ......
Page 32: ...www eta co at www eta co at downloads DOWNLOAD ...