General
Warranty, guarantee and liability
5
Observe local building and fire safety regulations
Local building and fire safety regulations must be
observed.
Expanding the control system
Only components provided by us may be used for
expanding the control system, unless these are
generally available standard devices, such as thermo-
stats.
Regularly perform cleaning and maintenance
Cleaning and maintaining the product is essential. The
required steps and intervals are either contained in this
documentation or included as a separate document.
Repairs
Repairs are only permitted using spare parts provided
by us. The only exceptions are common standardised
parts such as electrical fuses or fastening materials, as
long as they possess the required features and do not
restrict the functionality of the system.
Proper installation
The installing contractor is liable for proper installation
according to the corresponding installation instructions
and the relevant rules and safety regulations. If you as
customer have installed the heating system partly or
entirely without relevant training and in particular
without up-to-date practical experience, without having
the installation checked by a trained and responsible
expert, we exclude defects in our delivery and conse-
quential damages resulting from this cause from our
warranty, guarantee and liability.
Repair of defects
For repairs of defects carried out by the customer or by
a third party, ETA shall only bear the costs or remain
obligated by warranty if this work was approved in
writing in advance by the customer service of ETA
Heiztechnik GmbH.
Surface corrosion
Surface corrosion on the inside of the precipitator is no
cause for concern. It does not impair the function.
Surface corrosion does not entitle to warranty or
guarantee claims.
Insulate the connecting pipe to the chimney
The connection between the boiler and the chimney
should be insulated with at least 30 mm, preferably 50
mm, of mineral wool to avoid thermal losses, which
can lead to a build-up of condensation.
Potential equalization is needed for the boiler
The boiler must be connected to the potential equaliza-
tion of the boiler room or the building. Country-specific
regulations must be observed.
Summary of Contents for EEP 130
Page 30: ...www eta co at ...
Page 31: ......
Page 32: ...www eta co at www eta co at downloads DOWNLOAD ...