Log boiler emission measurement
Emission measurement
2
Emission measurement
Why measure emissions?
It is a requirement for the carbon monoxide (CO)
emissions of every boiler to be measured periodically.
In Germany, this periodic measurement must also
include a dust measurement.
There are several aspects of this that could go wrong,
resulting in incorrect measurements even though the
boiler fully and consistently complies with these limits
when operating in accordance with the relevant
standards.
Notes on emission measurement in Germany
In accordance with the provisions of "BImSchV,"
lower limit values for the emission measurement
in Germany apply to all new heating system installa-
tions starting 1 January 2015. Notes on compliance
are found under
12 "Low-emission operation"
.
Clean the boiler 3 - 5 days before the emission
measurement
Thoroughly clean the boiler and flue pipe 3 - 5 days
before the emission measurement. Once this is
complete, heating can resume as usual.
This delay between cleaning and measurement
is necessary in order to allow dust disturbed
during cleaning to settle again. If the chimney sweep
measures unsettled dust, the dust reading will be
higher than normal and thus inaccurate.
CAUTION!
Under no circumstances clean the boiler and flue
pipe on the day of the measurement!
Buffer and boiler must be cold
Before the start of the emission measurement, the
buffer and the boiler must have cooled down to ensure
heat consumption in the heating system during the
emission measurement.
Preferably, the boiler should not be used the night
before the emission measurement.
Ensure sufficient heat consumption
Open all radiator valves and turn radiator thermostats
to maximum.
2.1
Log boiler emission
measurement
Use half-metre split logs
Use half-metre split logs for the emission measure-
ment. Place them as close together as possible in the
fuel chamber to fill it as completely as possible.
However, keep the burn-through openings in the grate
free.
Prepare and perform emissions measurement
1. In the log boiler overview, press the [Measure-
ment]
button in order to open the emissions
measurement settings window.
Fig. 2-1: Settings window for emission measurement
2. By pressing the [Start now]
button, the log
boiler will immediately begin preparations for a
subsequent measurement after heating up.
Use the [Begin measurement]
button to enter
the date agreed for chimney sweeping. If the date
has been entered, it will appear in the boiler
overview.
Fig. 2-2: Set date
In addition, the locking time of the log boiler can be
adjusted (
[Lock duration] button). This relates
to the set time of the measurement. During this
period, a warning notice will appear that no heating
operation should be started, so that the heating
system has time to cool down.
Example: If a time of 17:00 is set for emissions
Summary of Contents for TWIN 20 kW
Page 1: ...2016 04 02 EN 0000000302 V 001 X 36 0 2303 93412 001 TWIN pellet burner 20 26 kW Operation ...
Page 39: ...ETAtouch controller TWIN function block 39 ...
Page 49: ...ETAtouch controller Buffer function block 49 ...
Page 53: ...ETAtouch controller Hot water tank function block 53 ...
Page 57: ...ETAtouch controller Fresh water module function block 57 ...
Page 81: ......
Page 82: ...www eta co at ...
Page 83: ......
Page 84: ...www eta co at ...