background image

2

Molift MRS Duo / www.etac.com 

MRS Duo

MRS Duo is a mobile 2 post gantry intended for 
Molift Air and Molift Nomad lifters. The  purpose 
is for lifting and transferring a person from/to 
bed, floor, chair, wheelchair or toilet with a sling. 
The MRS Duo is made of light-weight materials, 
can easily be disassembled and mounted for new 
locations, and has four step adjustable posts from 
2,25 to 2,55 meters. Boom ranges from 2 to 3,5 

meters and the lifting capacity is 300 kg (661 
lbs). It is ideal for hospitals and institutional, in 
environments where permanent installations are 
not possible or desirable, but can also be used 
in privates homes. The MRS Duo should only be 
used indoor on flat surfaces. Such as Bedroom, 
bathroom, living room etc.

About MRS Duo

MRS Duo components:

Boom

Quick  release  
bolt

Foot

Control
label

Outer
post

Product
label

End stop

Inner
post

Transport hole

Height
label

Adjustable 
screws

Summary of Contents for 1600013

Page 1: ...MRS Duo EN User manual BM20001 Rev B 2014 11 13...

Page 2: ...sinfection 9 Reconditioning 9 Recycling 9 Spare parts 9 Periodic Inspection 9 Pericodic Inspection Scope 9 Troubleshooting 10 Important This User Manual contains important safety instructions and info...

Page 3: ...step adjustable posts from 2 25 to 2 55 meters Boom ranges from 2 to 3 5 meters and the lifting capacity is 300 kg 661 lbs It is ideal for hospitals and institutional in environments where permanent...

Page 4: ...535 2006 Conditions for Use Lift and transfer of a person will always pose a certain risk and only trained personnel are allowed to use the equipment and accessories covered by this user manual Modifi...

Page 5: ...oot 11 kg 24 3 lbs Total weight 2 posts and boom 38 44 3 kg 83 8 97 lbs Available boom lengths A 2m 2 5m 3m 3 5 m Dimensions Width D 2 15 3 65 m Height B 4 steps x 100mm 2 25 2 55 m Depth E 1 2m Max i...

Page 6: ...t bolts trough holes and washer in boom 3 Use allen key located in top of post to screw in bolts 4 Make sure both bolts are properly fastened Do not stand under the boom when mounting use a stand or s...

Page 7: ...liftmotor does not hit the post 3 Use allen key located in top of post to screw in bolts Mounting charger to post 1 Remove plugs from holes on the post 2 Use the small allen key located in top of pos...

Page 8: ...ever leave a user unattended in a lifting situation Transport 1 Secure trolley se page 6 fastening end stop temporarily 2 Remove quick release bolt and lower MRS Duo 3 Place the quick release bolt in...

Page 9: ...300 Molift Air 205 Propulsion Molift Air 300 Propulsion Trolley for Molift Air MRS Trolley Basic Art no 2520000 MRS Trolley Propulsion Art no 2500103 Molift Nomad Molift Nomad portable hoist is suita...

Page 10: ...eport for MRS Duo This can be found on www etac com In the event of danger to safety the MRS Duo shall immediately be taken out of service and marked clearly with out of order and shall not be used un...

Page 11: ...re properly fastened Controll bolts between bracket and post Make sure bolts is properly fastened MRS Duo jams when lowering boom to transport position Quick release bolt is already inserted in bottom...

Page 12: ...Etac AS Etac Supply Gj vik Hadelandsveien 2 2816 Gj vik Norway Tel 47 4000 1004 molift etac com www etac com...

Reviews: