background image

6

Molift MRS Duo / www.etac.com 

Assembly

 

Adjusting post heights

1.  Lift the inner post and pull out quick release 

bolt.

2.  Lift post to desired height and insert quick 

release bolt trough outer post.

3.  Look at height labels and ensure that both 

post are adjusted at the same height.

Don`t stand under boom when 
adjusting post height

Make sure quick release bolt is 
properly installed

Don`t lift boom any higher when 
stop sign appears on height label

 End stops

1.  Lead the end stops to the desired position and 

tighten them.

2.  Make sure the liftmotor does not hit the post.
3.  Use allen key (located in top of post) to screw 

in bolts.

Mounting charger to post

1.  Remove plugs from holes on the post.
2.  Use the small allen key (located in top of post) 

to fasten screws.

3.  Fasten the lower screw first.
4.  Place charger on screw and insert second bolt.

Check list before use

Don`t start using MRS Duo before 
completing control according to 
checklist after assembly.

Use this checklist to verify that the MRS Duo is 
properly installed and can operate correctly and 
safely before use.

 

…

Make sure both bolts in foot are properly    

 fastened.

 

…

Make sure all four bolts on boom are prop  

 

early fastened.

 

…

Make sure quick release bolts are correctly  

 installed

 

…

Make sure end stops are properly fastened

Summary of Contents for 1600013

Page 1: ...MRS Duo EN User manual BM20001 Rev B 2014 11 13...

Page 2: ...sinfection 9 Reconditioning 9 Recycling 9 Spare parts 9 Periodic Inspection 9 Pericodic Inspection Scope 9 Troubleshooting 10 Important This User Manual contains important safety instructions and info...

Page 3: ...step adjustable posts from 2 25 to 2 55 meters Boom ranges from 2 to 3 5 meters and the lifting capacity is 300 kg 661 lbs It is ideal for hospitals and institutional in environments where permanent...

Page 4: ...535 2006 Conditions for Use Lift and transfer of a person will always pose a certain risk and only trained personnel are allowed to use the equipment and accessories covered by this user manual Modifi...

Page 5: ...oot 11 kg 24 3 lbs Total weight 2 posts and boom 38 44 3 kg 83 8 97 lbs Available boom lengths A 2m 2 5m 3m 3 5 m Dimensions Width D 2 15 3 65 m Height B 4 steps x 100mm 2 25 2 55 m Depth E 1 2m Max i...

Page 6: ...t bolts trough holes and washer in boom 3 Use allen key located in top of post to screw in bolts 4 Make sure both bolts are properly fastened Do not stand under the boom when mounting use a stand or s...

Page 7: ...liftmotor does not hit the post 3 Use allen key located in top of post to screw in bolts Mounting charger to post 1 Remove plugs from holes on the post 2 Use the small allen key located in top of pos...

Page 8: ...ever leave a user unattended in a lifting situation Transport 1 Secure trolley se page 6 fastening end stop temporarily 2 Remove quick release bolt and lower MRS Duo 3 Place the quick release bolt in...

Page 9: ...300 Molift Air 205 Propulsion Molift Air 300 Propulsion Trolley for Molift Air MRS Trolley Basic Art no 2520000 MRS Trolley Propulsion Art no 2500103 Molift Nomad Molift Nomad portable hoist is suita...

Page 10: ...eport for MRS Duo This can be found on www etac com In the event of danger to safety the MRS Duo shall immediately be taken out of service and marked clearly with out of order and shall not be used un...

Page 11: ...re properly fastened Controll bolts between bracket and post Make sure bolts is properly fastened MRS Duo jams when lowering boom to transport position Quick release bolt is already inserted in bottom...

Page 12: ...Etac AS Etac Supply Gj vik Hadelandsveien 2 2816 Gj vik Norway Tel 47 4000 1004 molift etac com www etac com...

Reviews: