System Overview
11
Emergency System Overview
ArcSystem drivers and luminaires can be purchased in UL924 listed variants. Each of the
luminaires can be configured to be UL924 listed when wired into an existing emergency
response system.
•
See
Emergency System One-Cell Installation on page 26
.
•
See
Emergency System Multi-Cell Installation on page 37
Install the ArcSystem D1, D2, or D4 Series driver or multi-cell luminaire in a location that is
accessible by qualified personnel for testing of the emergency operation.
Install the ArcSystem multi-cell luminaire in a location that is accessible by qualified personnel
for testing of the emergency operation.
Note:
Luminaires must be hard-wired to emergency certified drivers to be considered
for UL924 certification.
Note:
The number of designated emergency lamps and their height is the
responsibility of the specifier and installer in order to achieve the minimum FC levels of
NFPA101. Installation scenarios should be evaluated by the AHJ to confirm illuminance
and performance requirements of ANSI/NFPA 101 and the IBC.
Note:
ArcSystem Pro One-Cell Micro luminaires in emergency installations must be
installed with a maximum mounting height of 23.2 ft (7.07 m).
Note:
Installation must follow all national and local codes for electrical equipment.
Note:
Normal and emergency wiring cannot be contained in the same conduit
according to NEC 700.10(B).
Summary of Contents for ARCP1
Page 1: ...ArcSystem Installation Manual Part Number 7490M2100 Rev G Released 2019 11...
Page 6: ...iv ArcSystem Installation Manual...
Page 61: ...55...
Page 62: ...56 ArcSystem Installation Manual...
Page 63: ...57...