409-35011
Rev D
28
of 83
RECEIVING INSPECTION AND INSTALLATION
Receiving inspection
The machine is thoroughly inspected during and after assembly. Before it is packed for shipment, a final series
of tests and inspections are made to ensure proper functioning.
1. After the machine is received at the facility of use, compare it to Figure 28. Make note of any
differences.
If tooling, blades, mandrels, etc. are shipped separately, they must be inspected separately.
Examine the Tip(N)Tells
™
and photograph them if they indicate tipping or mishandling during
shipment.
Figure 28: How a newly-received HV-CP should look