409-35011
Rev D
34
of 83
Installation
1. With the machine in the production location, use a bubble level to level the machine by adjusting the
four supplied foot levelers.
2. Connect the pneumatic supply to the port provided in the utility alcove in the left side panel of the
machine. Any supply pressure in the .552-.827 MPa [80-120 psi] range is acceptable.
3. Install a quick disconnect onto the customer-supplied industrial air line and connect it to the machine
port. The final connection should resemble Figure 41.
NOTE
The digital pressure switch and the air regulator are set at the factory. Do not modify their settings.
Figure 41: Connecting the pneumatic supply
1
Pneumatic lockout valve
2
Main supply port
3
Quick disconnect (customer supplied)
4
Air line (customer supplied)
5
Machine air regulator
6
Digital pressure switch
4. Ensure that the electrical supply meets the requirements shown on the machine ID label (Figure 13):
200 to 265V AC
50/60Hz
Single phase (L-N or L-L)
10 Ampere
Protected by a breaker rated for at least 10,000 IAC