www.ets-lindgren.com
Pneumatic Polarization Upgrade Kit
37
2.
Remove the carrier from the mast on the 7-TR:
Remove protective cap from top of mast.
Unscrew the hand knob clamp.
Lift to completely remove the carrier from mast.
3.
Install the new carrier:
Insert the new carrier onto the top of the mast.
Slide the carrier down the mast to the desired height.
Tighten the hand knob clamp to secure the carrier into place.
Summary of Contents for 7-TR
Page 4: ...iv www ets lindgren com This page intentionally left blank ...
Page 6: ...vi www ets lindgren com Appendix A Warranty 49 ...
Page 8: ...viii www ets lindgren com This page intentionally left blank ...
Page 16: ...16 Introduction www ets lindgren com This page intentionally left blank ...
Page 22: ...22 Maintenance www ets lindgren com This page intentionally left blank ...
Page 24: ...24 Specifications www ets lindgren com This page intentionally left blank ...
Page 28: ...28 Assembling the 7 TR www ets lindgren com This page intentionally left blank ...
Page 48: ...48 Operation www ets lindgren com This page intentionally left blank ...